Arco/Starbucks AQ/GHG Analysis

Raney prepared a stand-along Air Quality and Greenhouse Gas technical study for an Arco AM/PM gas station and a Starbucks drive-thru store per the requirements of SMAQMD.

General Details

The Arco/Starbucks project was located at 12821 East Stockton Boulevard in the City of Galt, California. The applicant proposed to construct an Arco and AM/PM with a convenience store and an eight (8) dispenser, 16-pump fueling station and a Starbucks with a drive-thru. The Arco/Starbucks AQ/GHG Analysis project required a Conditional Use Permit (CUP) to operate the Arco AM/PM convenience store and Starbucks. The applicant additionally requested a parcel map to split the 1.06 acre lot to create a 14,287-square foot parcel to accommodate the Starbucks and a 31,188-square foot parcel for the Arco AM/PM.

The Air Quality and Greenhouse Gas Impact Analysis was prepared consistent with the requirements of the Sacramento Metropolitan Air Quality Management District (SMAQMD), the California Environmental Quality Act (CEQA), and City of Galt. The Air Quality and Greenhouse Gas Technical Study has since been provided to the City of Galt for incorporation into a larger CEQA document.